Coverart for item
The Resource Integrated cost-schedule risk analysis, David Hulett, (electronic resource)

Integrated cost-schedule risk analysis, David Hulett, (electronic resource)

Label
Integrated cost-schedule risk analysis
Title
Integrated cost-schedule risk analysis
Statement of responsibility
David Hulett
Creator
Subject
Language
eng
Cataloging source
DLC
http://library.link/vocab/creatorName
Hulett, David T
Dewey number
658.15/52
LC call number
HD69.P75
LC item number
H85 2011
http://library.link/vocab/subjectName
  • Project management
  • Costs, Industrial
  • Risk assessment
Label
Integrated cost-schedule risk analysis, David Hulett, (electronic resource)
Instantiates
Publication
Bibliography note
Includes bibliographical references and index
Contents
  • Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis
  • Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis
  • Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis
Control code
OCM1bookssj0000529632
Dimensions
25 cm.
Dimensions
unknown
Extent
xix, 218 p.
Governing access note
License restrictions may limit access
Isbn
9780566091667
Isbn Type
(hbk. : alk. paper)
Lccn
2010049003
Other physical details
ill.
Specific material designation
remote
System control number
(WaSeSS)ssj0000529632
Label
Integrated cost-schedule risk analysis, David Hulett, (electronic resource)
Publication
Bibliography note
Includes bibliographical references and index
Contents
  • Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis
  • Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis
  • Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis
Control code
OCM1bookssj0000529632
Dimensions
25 cm.
Dimensions
unknown
Extent
xix, 218 p.
Governing access note
License restrictions may limit access
Isbn
9780566091667
Isbn Type
(hbk. : alk. paper)
Lccn
2010049003
Other physical details
ill.
Specific material designation
remote
System control number
(WaSeSS)ssj0000529632

Library Locations

    • Thomas Jefferson LibraryBorrow it
      1 University Blvd, St. Louis, MO, 63121, US
      38.710138 -90.311107
Processing Feedback ...