The Resource Mid-Coast Corridor Transit Project final environmental impact report, by the Federal Transit Administration, U.S. Department of Transportation and the San Diego Association of Governments (SANDAG)

Mid-Coast Corridor Transit Project final environmental impact report, by the Federal Transit Administration, U.S. Department of Transportation and the San Diego Association of Governments (SANDAG)

Label
Mid-Coast Corridor Transit Project final environmental impact report
Title
Mid-Coast Corridor Transit Project final environmental impact report
Statement of responsibility
by the Federal Transit Administration, U.S. Department of Transportation and the San Diego Association of Governments (SANDAG)
Title variation
  • Mid-Coast Corridor Transit Project final SEIS/SEIR
  • Mid-Coast Corridor Transit Project San Diego, California
  • Mid-Coast Corridor Transit Project
Title variation remainder
  • final supplemental environmental impact statement
  • final supplemental environmental impact statement and subsequent environmental impact report
Creator
Contributor
Author
Issuing body
Subject
Genre
Language
eng
Cataloging source
CUS
Government publication
  • publication from multiple local governments
  • federal national government publication
Illustrations
  • illustrations
  • maps
Index
no index present
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/relatedWorkOrContributorName
San Diego Association of Governments
http://library.link/vocab/subjectName
  • Transportation
  • Regional planning
  • Local transit
  • Environmental impact analysis
  • Fairy shrimps
  • Environmental impact analysis
  • Fairy shrimps
  • Local transit
  • Regional planning
  • Transportation
  • California
  • California
Label
Mid-Coast Corridor Transit Project final environmental impact report, by the Federal Transit Administration, U.S. Department of Transportation and the San Diego Association of Governments (SANDAG)
Instantiates
Publication
Note
  • "September 2014."
  • "Prepared pursuant to National Environmental Policy Act of 1969 ..."
  • "State Clearinghouse No. 2010051001."
  • "SANDAG and the Federal Transit Administration have released the final environmental document analyzing potential impacts of the Mid-Coast Corridor Transit Project. Called the Mid-Coast Corridor Transit Project Final Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report (SEIS/SEIR), this document contains all comment letters and responses to comments received on the Draft SEIS/SEIR (dated April 2013) and the SEIS/Supplement to the SEIR (dated July 2014). Additionally, on October 15, 2014, the Federal Transit Administration issued the Record of Decision for the project. The Record of Decision is contained in Appendix D of the Final SEIS/SEIR Volume 1."
Bibliography note
Includes bibliographical references
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Control code
896176429
Dimensions
unknown
Extent
1 online resource (3,283 unnumbered pages)
Form of item
online
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
color illustrations, color maps
Specific material designation
remote
Label
Mid-Coast Corridor Transit Project final environmental impact report, by the Federal Transit Administration, U.S. Department of Transportation and the San Diego Association of Governments (SANDAG)
Publication
Note
  • "September 2014."
  • "Prepared pursuant to National Environmental Policy Act of 1969 ..."
  • "State Clearinghouse No. 2010051001."
  • "SANDAG and the Federal Transit Administration have released the final environmental document analyzing potential impacts of the Mid-Coast Corridor Transit Project. Called the Mid-Coast Corridor Transit Project Final Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report (SEIS/SEIR), this document contains all comment letters and responses to comments received on the Draft SEIS/SEIR (dated April 2013) and the SEIS/Supplement to the SEIR (dated July 2014). Additionally, on October 15, 2014, the Federal Transit Administration issued the Record of Decision for the project. The Record of Decision is contained in Appendix D of the Final SEIS/SEIR Volume 1."
Bibliography note
Includes bibliographical references
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Control code
896176429
Dimensions
unknown
Extent
1 online resource (3,283 unnumbered pages)
Form of item
online
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
color illustrations, color maps
Specific material designation
remote

Library Locations

  • St. Louis Mercantile LibraryBorrow it
    1 University Blvd, St. Louis, MO, 63121, US
    38.710138 -90.311107
  • Thomas Jefferson LibraryBorrow it
    1 University Blvd, St. Louis, MO, 63121, US
    38.710138 -90.311107
  • University ArchivesBorrow it
    703 Lewis Hall, Columbia, MO, 65211, US
  • University of Missouri-St. Louis Libraries DepositoryBorrow it
    2908 Lemone Blvd, Columbia, MO, 65201, US
    38.919360 -92.291620
  • University of Missouri-St. Louis Libraries DepositoryBorrow it
    2908 Lemone Blvd, Columbia, MO, 65201, US
    38.919360 -92.291620
  • Ward E Barnes Education LibraryBorrow it
    8001 Natural Bridge Rd, St. Louis, MO, 63121, US
    38.707079 -90.311355
Processing Feedback ...